Which two activities does the RMF Monitor step include beyond assessing control effectiveness? Choose two.
Show the answer
Answer: B. Documenting changes to the system and its environment of operation
D. Conducting risk assessments and impact analyses
SP 800-37 states the Monitor step monitors the system and controls on an ongoing basis, including assessing control effectiveness, documenting changes to the system and environment, conducting risk assessments and impact analyses, and reporting posture.
Source: NIST SP 800-37 Rev. 2 (NIST) — Sec. 2.2 RMF Steps and Structure