CISM study material · question 887 of 1000
Where an outage can be prevented feasibly and cost-effectively, which does NIST prefer?
Show the answer
Answer: D. The preventive measure, because preventing an outage costs less than recovering from one
SP 800-34r1 states measures to prevent or reduce the effects of system disruption are preferable to actions needed to recover the system after a disruption, where they are feasible and cost-effective.
Source: NIST SP 800-34 Rev. 1 (NIST) — Sec. 3.3 Identify Preventive Controls